Meridian survey crew chief, Mo Sykes, initiated this project with a design topography survey of the stadium area prior to the proposed turf installation for the football field and track re-surfacing. Our civil engineering team used the survey data to overlay the play field design elements. Following that design phase, Heather Butler, survey crew chief, returned for construction layout and one last verification of the surface to ensure the football field is ready for turf to be placed. This verification is part of our process to confirm the required accuracy of the new field is achieved for the proposed turf.