Trailside Elementary School

 

Summary

This 80,000 square foot Pre-Kindergarten-6 elementary school was designed by the KMA Architects team for Alpine School District. Located at 452 North Vineyard Loop Road, Vineyard, Utah, the final product built by Westland Construction, serves as the home of the raptors for this fast-paced growing community of over 900 students in a fringe residential setting.

Meridian provided the ALTA/NSPS land title boundary and topographic surveys for the project. The civil site design work by Meridian included drainage and accessible grading plans, parking, drop off pick up zone, play field design, utility plan tie-ins including water and sewer, site balance and drainage retention system. Construction period services and storm water pollution prevention plans were also included in the civil design scope

Project Details

  • Owner: Alpine School District, Frank Pulley
  • Client: KMA Architects
  • Completion Date: August 2021

Civil Survey Team

  • Nichole Luthi, Senior Project Manager
  • Travis Williams, Survey Project Manager